How costs will compare during and after construction of wind turbines

Respuesta :

claratottenp4x0a5
claratottenp4x0a5 claratottenp4x0a5
  • 01-03-2018
The initial cost will be greater than continuing to use other energy resources due to the construction of the wind farm; manufacturing the turbines and establishing them on site.
However the long term cost will be lower because wind is a free energy source, providing energy with no further input of funds.
Answer Link

Otras preguntas

What codes for proteins? amino acids O RNA O polypeptides O DNA O ​
Determine the intervals on which the function is increasing, decreasing, and constant. A. Increasing x>0; Decreasing x<0 B. Decreasing on all real number
work out 1.56/0.4 MUST SHOW WORKING
Question 6 Which compound is more soluble in water? O 3-propyl-2-octanol 1-methyl-3-pentanol O2-methyl-1-ethanol 02-ethyl-3-heptanol mouthing
which answer is right?
Help me asap im not good at math
what are the advantage of the presence of hydrogen in large scale in the sun ?​
Mid/-hill Highway construction project will be the milestone for the economic growth of the country. Justify.
Question 1 of 10 What is the measure of ZXYZ shown in the diagram below? Y S (369 7 Х 1140 Plz help
How many degrees are there between the direction of motion and the force of friction? A. 270 B. 90 C. 180 D.0