When one party to a contract fails to perform as promised, it is called
a. bad faith.
b. liquidated damages.
c. breach.
d. litigation?

Respuesta :

Crazyanimegirl
Crazyanimegirl Crazyanimegirl
  • 02-05-2017
C.Breach   hope this help (:
Answer Link

Otras preguntas

Tom drives a truck. His regular trip is a distance of 280 km. He drives at an average speed of 80 km/h. For safety reasons Tom’s boss puts a speed limiter on h
Which measurement is the best estimate for the length of a bean? A : 13 mm B : 13 cm C : 13 m D : 13 km
A sporting goods store sells triangular team pennants in two sizes. The base of one pennant is 18 in. and the length of the side is 9 in. The other pennant is s
Nitrogen gas is MOST COMMONLY found in which of Earth's spheres? a.biosphere b.exosphere c.atmosphere d.hydrosphere
The boss made a schedule change. For some reason, the boss made a schedule change. A. inverted the subject-verb order B. changed sentence to a compound senten
Estimate the sum by rounding each number to the nearest half or whole. 2 1/2+ 5 5/8
In what year did Disney XD lab rats came out?
what Is a barrier island
How did George Washington feel about the Articles of Confederation?
What enables Dna to have so many variations with only 4 chemicals?