Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

why is 743 a prime number
what types of landforms cover most of Japan
what is the meaning of of the phrase hideous cruelty
what is a "summary number model"?
what gas does hydrogen change into as a star becomes hotter
Identify the type of chemical reaction. H2CO3 H2O + CO2 decomposition exchange reversible synthesis
What's 7/8x4/5? Cmon peeps it's hard
Which defines separation of powers? A. division of political power among branches of government B. division of authority among law enforcement agencies C. divis
The sides of a triangle have lengths s, s + 4, and 3s. Which expression represents the perimeter of the triangle?
What country today contains the land that was called Persia