medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

RecommendLions Eighth grade > Z.6 Is it a complete sentence or a run-on? $561 Which is a run-on sentence? The Equator stays warm year-round because it always
how do animal cells and plant cells react differently to osmosis in a hypotonic solution?
Letty groaned as the alarm clock sounded. A textbook was still open next to her on the bed. With eyes half-open, she dressed in her waitressing uniform. Early c
Solve the following: -3x + 7(x + 5) = 5x + 38
What does the suffix -saccharide mean?
Consider this line graph that represents speed in meters/second. The X-axis is labelled in seconds; the Y-axis is labelled in meters. Suppose that a moving obj
20 POINTS PLZ HELP ME
Quote:Government are instituted among men to secure these rights.. Explain quote. Question: What is the role of government? Explain
A rectangle is 7 inches long and 4 inches wide what is the perimeter?po
Independent clause with ; and independent clause about summer