A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

Draw the structure of each of the following fatty acids, and give the structure its common name. (a) $n$ -Dodecanate (b) $c i s-\Delta^{9}$ -Hexadecenoate (c) $
i need help with prob #2 on this
please answer me fast plz ​
4. Assuming the orbital radius of the Moon is 3.85 x 108 m, find the linear speed of the moon.
when we write a paragraph we should consider three(3) main elements which are​
Can anyone help please! Ixl geometry
In a country that only wants girls, every family continues to have children until they have a girl. If they have a boy, they have another child. If they have a
1,A ladder with nine rungs is to be built, with the bottom rung 24cm. wide and the top rung 18cm. wide. If the length of the rungs decreases uniformly from bott
what are the scientist doing incorrectly? what could they do to make their work in the lab safer? why is it important to follow these procedures? part E
In below diagrams, line BC is parallel to DE.