kimbrachantel2962 kimbrachantel2962
  • 03-03-2020
  • Computers and Technology
contestada

The transition from ____ is initiated by the Job Scheduler according to some predefined policy. At this point, the availability of enough main memory and any requested devices is checked.

Respuesta :

isaacoranseola
isaacoranseola isaacoranseola
  • 04-03-2020

Answer: Hold to ready

Explanation:

This is when the process is waiting to be assigned to a processor. And this is carried out by the short term scheduler, so it can run. This state is immediately after the new state for the process.

Answer Link

Otras preguntas

help with B? Can you also make sure the Part b is correct too?
11/40ths simplified in fractions
A geographic resource containing map collections is a(n) _____.
What are 3 types of imperialism
2a2b3 and -4a2b3 are like terms. a. True b. False
Nolan practices the piano for 1 2/5 hours every Saturday and Sunday. How long does he practice each weekend?
The plains Indians embraced the ghost dance movement because they were?
Diane Nash struggled with something as she worked for civil rights. How did her decision contribute to success
A quantity that has magnitude only is a _____. scalar diagonal vector
The area of earthquake and volcanic activity around the rim of the Pacific Ocean is called the