carl105
carl105 carl105
  • 04-04-2016
  • Mathematics
contestada

what is In 7 days, a group of workers can plant 21 acres. What is their rate in acres per day?

Respuesta :

kelpel197
kelpel197 kelpel197
  • 04-04-2016
So do 21/7 to give you how much they do in a day. The answer is three so they do 3 aceres in a day.
Answer Link

Otras preguntas

24/5 in simplest form please help me.
How is Europe connected
mr. Robbins has $2,730 in his checking account and $11,019 in his savings account. Round to the nearest hundred and add to find about how much money he has in b
Abag of cookies can be shared equally among 2, 3,4,5, or 6 friends. what is the least number of cookies the bag could have
In the equation x-4y=2, for what value of x will y=0?
What happens to the Mississippi River water when it flows into the Gulf of Mexico?
The Federal Deposit Insurance Corporation (FDIC) __________. insures customer deposits if a bank fails insures banks if a borrower does not repay the loan insur
The leg's force forward on the foot= 500N The foot's force forward on the ball= 500N The ball's force back on the foot= 500N What is the net force on the ball?
What are particles of carbon otherwise known as, and what kind of pollution do they cause???
What would be the mean if the value 3 was added to the following set? 14, 14, 17, 19, 25 17.8 20.8 18.4 15.3